Struja Consulting
Rooftop & Land Solar Assessment

Solar Atlas

—
Roofs read from orbit
buildings detected
Roof size → solar host quality
X-large (>2000 m²)
Large (500–2000)
Medium (150–500)
Small (50–150)
Tiny (<50)
–MWp rooftop potential
Estimated installable solar capacity across all detected rooftops in the surveyed area.
01

Rooftop solar potential

Headline results across every detected roof, using the assumptions in the panel below. Adjust them and these update live.

Installable capacity
–MWp
–
Annual generation
–GWh/yr
–
Homes powered
–
–
CO₂ avoided
–kt/yr
vs Indian grid electricity
02

Assumptions & economics

Every number on this page is driven by these levers. Defaults reflect typical Indian rooftop practice — tune them to your project.

Usable roof fraction70%
Share of the detected footprint actually available after shading, water tanks, setbacks and access paths.
Area per kWp10.0 m²
Roof area needed per kWp of panels. ~10 m²/kWp is typical for Indian rooftop mono-PERC.
Specific yield1456 kWh/kWp
Annual energy per kWp. Default is PVGIS-ERA5 modelled yield for this exact location (15° tilt, south).
Installed cost (CAPEX)₹45,000/kWp
All-in installed cost per kWp.
Electricity tariff₹6.50/kWh
Value of each kWh generated (offset or sold).
Total investment potential₹–Cr
Annual energy value₹–Cr
Simple payback–yrs
Figures are area-based potential, not a site-verified engineering estimate.
03

Where the roof area is

Larger roofs — institutional buildings, warehouses, apartment blocks — are the strongest solar hosts. Bars show share of total detected roof area.

04

Land solar potential

Ground-mount potential from land inside the surveyed boundary, classified from OpenStreetMap land use. Total = open land + agricultural (agri-PV).

Total land potential: – MWp  =  open land – MWp  +  agricultural (agri-PV) – MWp
Open / vacant land
–ha
Scrub, grass and undeveloped plots — available for conventional ground-mount.
– MWp
Agricultural land
–ha
Cropland — solar only via agrivoltaics (dual-use with crops). Policy-restricted; an upper bound.
– MWp
Under construction
–ha
Land actively being built on — future rooftop stock, not counted.
Not counted
—
Agri-PV disclaimer: agricultural-land potential assumes agrivoltaics (elevated panels co-existing with cropping). It is shown as an upper bound only — actual use depends on land-use policy, farmer consent, crop compatibility and grid access, and typically achieves lower packing than open-land ground-mount. Airfield, military, port and industrial land are excluded from all figures.
05

How this was built

Fully reproducible from free, open datasets — no paid API keys.

Data sources

Rooftop footprints–
Land use / vacant land–
Solar yield–
Satellite basemapESRI World Imagery (key-free)

Method

  • AI-detected building polygons merged from three global datasets, de-duplicated by Overture.
  • Each footprint projected to UTM 43N and area summed — true ground area, not pixel counts.
  • Roof area → capacity via usable-fraction and area-per-kWp; capacity → energy via location-specific PVGIS yield.
  • Land use classified into developable / construction / cropland from OSM tags.
Limitations. Footprint = ground area; usable roof area is approximated by the fraction slider, not per-roof tilt/obstruction modelling. OpenStreetMap land-use coverage is incomplete, so vacant land is a floor, not a ceiling. Roof-strength (structural) and grid-hosting capacity are not assessed. Treat these as screening-level potential to prioritise sites, then verify on the ground. Survey boundary is a fixed bounding box over the city core, so areas just outside it are excluded.