Solar DesignerMY SITE
Design your own rooftop or ground solar · anywhere in the world

Find your spot, trace your roof, get a complete solar plan.

Tap “Use my location” (or type a latitude and longitude) to centre the satellite map, then draw around your roof or land. You’ll get the local solar resource, the plant design — panels, inverter, mounting structure — the cost (in your currency), the yearly generation and savings, and your CO₂ reduction. Free, no sign-up, no API keys. Equipment makes shown are Indian examples — adjust the currency, tariff and grid CO₂ factor for your market.

Tap “Use my location”, or enter a latitude and longitude, to centre the satellite map — then draw your roof or plot.
Step 1: Locate your address or coordinates above. Then pan/zoom to your building.
Your solar proposal

Rooftop solar plant

—
Plant capacity
—kWp
—
Annual generation
—MWh
—
Annual savings
—
—
Payback
—yrs
—
☀️ Solar resource
Annual irradiation (GHI)—
Peak sun hours—
Specific yield—
SourceNASA POWER
Irradiance for your exact coordinates. Peak sun hours = average daily energy per m².
▦ Solar panels
Make—
Panel wattage · edit ▸ Wp
Number of panels—
Module area—
Leading Indian module makers 🇮🇳
⚡ Inverter
Capacity (AC)—
DC : AC ratio1.20
Type—
Recommended—
🇮🇳 Indian make · others widely used in India
🔩 Mounting & balance of system
Mounting structure—
Structure makes 🇮🇳—
Cabling & protectionPolycab · KEI · Havells
MeteringBidirectional net meter
📈 Estimated monthly generation—
₹ System cost—
Total investment—
🌱 Savings & emissions
Annual savings—
Simple payback—
25-year savings—
—
t CO₂ / year
—
t CO₂ over 25 yr
—
trees planted equiv.
⚙︎ Assumptions
🧭 Site & array — tilt, orientation & shading
Roof / array tilt15°
Optimal ≈ your latitude.
Shading loss0%
Trees, parapets, nearby buildings, dust.
Roof facesSouth
South is best in the northern hemisphere.
Array factor—
Usable roof fraction70%
Area per kWp (roof)10.0 m²
Ground density2.0 ha/MWp
Grid CO₂ factor0.71 kg/kWh
Installed cost₹45,000/kWp
Electricity tariff₹6.50/kWh
Performance ratio75%
Screening-level design. Sizing, equipment and costs are indicative, generated from the area you drew, your location’s irradiance and standard assumptions. Equipment makes are suggestions, not endorsements. Not a substitute for a site survey, structural/shadow analysis or DISCOM feasibility & net-metering approval. Verify before you commit.